A coherent reconstruction-services lane under Canadian SEMA easing — demand class evidenced in World Bank infrastructure scope, with fewer Syria-specific Canadian deal precedents than power. Medium confidence. Not project or bank clearance.
Last reviewed: · Ranked #7 in contribution research
Demand class (World Bank): Reconstruction best estimate US$216B (range $140–345B), of which US$82B infrastructure — infrastructure rebuild scope discussed alongside power, transport, telecom, and WASH — World Bank, 21 October 2025. Treat this as a demand category, not an itemized Canadian tender list. Assessment PDFs are not hosted on this site.
Approved IDA grant (institutional demand evidence): Syria Emergency Water Security and Resilient Services Project — US$150M IDA grant (Board 23 April 2026) for bulk water and climate-proof treatment in Idlib, Homs and Hama, plus Damascus wastewater rehabilitation — World Bank, 23 April 2026. This is Syrian-side public financing, not Canadian project clearance. Full IDA table: Figures — WB IDA.
Canadian capability signal (weak / not Syria-specific): Canada exported $20.2B environmental and clean technology products in 2024 — StatCan The Daily, 17 February 2026.
Canadian contribution mode: water and WASH infrastructure services, engineering, and equipment supply where listings and payment rails allow — secondary to power-system services in contribution ranking.
Primary / institutional: GAC Syria; SOR/2011-114; World Bank reconstruction press release (21 October 2025); World Bank water IDA grant (23 April 2026); StatCan ECT Daily. See References — WB IDA.